August 2, 1993 <br /> Town Board <br /> Town of Blooming Grove <br /> Dane County Zoning <br /> SUBJECT: Mineral extraction on White ET. AL. Deloris former <br /> Louie and Norma Ziegler farm) . <br /> 1. USE - A possible use of this clay, should we be selected, <br /> would be for capping six City of Madison Dane County <br /> landfills . These sites will be capped as approval <br /> from the State of Wisconsin Department of Natural <br /> Resources is granted and City of Madison Dane County <br /> select a time table. <br /> 2. TIME TABLE - I would estimate a schedule of five to eight <br /> years, with extraction taking place 4-6 weeks in the <br /> summer months . <br /> 3 . PROCESS - Depending upon the size of the site to be capped, <br /> an area would be striped of topsoil, topsoil would <br /> be stockpiled, clay would be removed and loaded onto <br /> trucks for delivery to the capping site. On site <br /> fill would be placed in excavation area and topsoil <br /> replaced and seeded. <br /> 4. TRUCKING - Absolutely NO TRUCK HAULING would be allowed <br /> south on Sprecher Road from the site. Trucks would <br /> turn north on Sprecher to Highway T. ( 0.2 miles) <br /> 5. BLASTING - We will place a deed restriction on the property <br /> for NO BLASTING as this is not required for this type <br /> of extraction. <br /> 6. A.N.R. PIPELINE - We have contacted A.N.R. and asked for <br /> any safety concerns they may have. Their reply is <br /> attached. <br /> 7. HOURS OF OPERATION - As we would be only suppliers, the <br /> contractor placing the clay would designate the <br /> hauling time schedule. I would purpose 7:00 a.m. <br /> until 4:00 p.m. <br /> 8. SPRECHER ROAD - We would agree to maintain the part of <br /> Sprecher Road we would use to its present condition. <br /> Also a sweeper and water wagon would be on site for <br /> use during the extraction period. The town road <br /> leading to Sprecher from the site will be graveled <br /> and graded during extraction. <br />