Laserfiche WebLink
Haug Timber Lane 2-Lot CSM and Rezone-MOTION TO CONDITIONALLY <br /> APPROVE <br /> I move to approve the 2-Lot CSM and Rezone subject to the following conditions: <br /> • To require Lot 2 to submit a site plan for review and approval as part of the building permit <br /> process. The applicant for a building permit for Lot 2 shall be responsible for all review fees <br /> incurred by the Town. A note shall be added to the CSM stating "Site Plan approval by the <br /> Town Engineer and Town Administrator is required on Lot 2 prior to issuance of a building <br /> permit for the purpose of reviewing proposed drainage conveyance, maximum driveway <br /> overflow elevation, minimum low opening elevation, and the 100-year rainfall event limits <br /> and elevations." The Site Plan shall demonstrate compliance with the following items: <br /> o The minimum opening elevation of the proposed building on Lot 2 can be no <br /> lower than(1118.5); <br /> o The culverts and driveway serving Lot 2 shall be constructed as submitted on the <br /> plan and as supported by design documents presented by the applicant on January <br /> 7, 2016. If it is necessary to revise the culvert or driveway configuration during <br /> site design,the applicant shall provide calculations demonstrating that the <br /> drainage capacity of the proposed culverts and overflow across the driveway on <br /> Lot 2 is equal to or greater than the capacity of the culverts beneath Timber Lane; <br /> o An overflow for the driveway on Lot 2 shall be provided at an elevation no <br /> greater than 1116.5; <br /> • To require driveway access to Lot 2 from Windermere Court. <br /> • To require elimination of the second (south) driveway on Lot 1. <br /> • To require rezoning of both lots to A-1. <br /> • Resolution of the items outlined in the Vierbicher letter dated January 13, 2016, except: <br /> • To allow creation of lots by CSM less than five acres unless the applicant owns 40 acres <br /> adjacent to the proposed lots, as lot sizes are consistent with existing adjacent lots; <br /> • To not require the creation of covenants and restrictions that are compatible with Plum <br /> Hollow as those lots are not close enough; <br /> • The existing vegetation can remain within the vision corner if it can be trimmed up to a <br /> height of 12'and verified by the Town Engineer; <br /> • The public stormwater and drainage easement be adjusted on the CSM to coincide with <br /> updated stormwater calculations and to accommodate a 100-year flood event. <br /> Motion made by Bill Motion seconded by Brent <br /> Vote Tally: 4 To Approve 0 To Deny Approval <br /> Date: 1/19/16 <br /> G:\My Documents\CSM and Rezone Approval Motion 011916 edited.doc <br />