|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-2015-10930
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2015
>
DCPREZ-2015-10930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 11:12:18 AM
Creation date
4/5/2016 11:12:15 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
10930
Town
Middleton Township
Section Numbers
18
AccelaLink
DCPREZ-2015-10930
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Haug Timber Lane 2-Lot CSM and Rezone-MOTION TO CONDITIONALLY <br /> APPROVE <br /> I move to approve the 2-Lot CSM and Rezone subject to the following conditions: <br /> • To require Lot 2 to submit a site plan for review and approval as part of the building permit <br /> process. The applicant for a building permit for Lot 2 shall be responsible for all review fees <br /> incurred by the Town. A note shall be added to the CSM stating "Site Plan approval by the <br /> Town Engineer and Town Administrator is required on Lot 2 prior to issuance of a building <br /> permit for the purpose of reviewing proposed drainage conveyance, maximum driveway <br /> overflow elevation, minimum low opening elevation, and the 100-year rainfall event limits <br /> and elevations." The Site Plan shall demonstrate compliance with the following items: <br /> o The minimum opening elevation of the proposed building on Lot 2 can be no <br /> lower than(1118.5); <br /> o The culverts and driveway serving Lot 2 shall be constructed as submitted on the <br /> plan and as supported by design documents presented by the applicant on January <br /> 7, 2016. If it is necessary to revise the culvert or driveway configuration during <br /> site design,the applicant shall provide calculations demonstrating that the <br /> drainage capacity of the proposed culverts and overflow across the driveway on <br /> Lot 2 is equal to or greater than the capacity of the culverts beneath Timber Lane; <br /> o An overflow for the driveway on Lot 2 shall be provided at an elevation no <br /> greater than 1116.5; <br /> • To require driveway access to Lot 2 from Windermere Court. <br /> • To require elimination of the second (south) driveway on Lot 1. <br /> • To require rezoning of both lots to A-1. <br /> • Resolution of the items outlined in the Vierbicher letter dated January 13, 2016, except: <br /> • To allow creation of lots by CSM less than five acres unless the applicant owns 40 acres <br /> adjacent to the proposed lots, as lot sizes are consistent with existing adjacent lots; <br /> • To not require the creation of covenants and restrictions that are compatible with Plum <br /> Hollow as those lots are not close enough; <br /> • The existing vegetation can remain within the vision corner if it can be trimmed up to a <br /> height of 12'and verified by the Town Engineer; <br /> • The public stormwater and drainage easement be adjusted on the CSM to coincide with <br /> updated stormwater calculations and to accommodate a 100-year flood event. <br /> Motion made by Bill Motion seconded by Brent <br /> Vote Tally: 4 To Approve 0 To Deny Approval <br /> Date: 1/19/16 <br /> G:\My Documents\CSM and Rezone Approval Motion 011916 edited.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.