|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00108
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2016 4:31:23 PM
Creation date
4/5/2016 4:31:07 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00108
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 3/11/2016 HUSTON,C LIAR oBnoax <br /> WI 053593-0220 Doc ID:51298 201 0311201101 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax: (608)845-7070 Cleary/Owner Project Contract - Erected <br /> Building Structure <br /> Building Name:Building 2 <br /> Energy Miser—WxLxH: 60'0"x 72' 0"x 17'-8" II <br /> Width:60'0" <br /> Length:9 Bays at 8' o.c. (Note:See drawing for ny custom bay sizes) <br /> Eave Height:17' 8" <br /> 16' 0"Interior(Truss)Clearance from the 100'+0' mark <br /> Roof System: High Clearance truss I <br /> Default Ceiling Design: Designed to Support a Lither Panel Ceiling <br /> Roof Pitch:4/12 <br /> Purlins:2"x4"Standard 2'0" inch on center <br /> Additional Accessories <br /> Purlin Blocking at Selected Trusses(Distance from Endwall 1):@ 0' 0";@ 72'0"; <br /> Custom Bays for: Building 2 <br /> Bay 01:8'0" Ceiling:Not Designed to Support'a Ceiling Roof System: High Clearance truss <br /> Bay 02:8'0" Ceiling:Not Designed to Support a Ceiling Roof System: High Clearance truss <br /> Bay 03:8'0" Ceiling: Designed to Support a St el Ceiling Roof System: High Clearance truss <br /> Bay 04:8'0" Ceiling: Designed to Support a St el Ceiling Roof System: High Clearance truss <br /> Bay 05:8'0" Ceiling:Designed to Support a St-el Ceiling Roof System: High Clearance truss <br /> Bay 06:8'0" Ceiling:Designed to Support a St-el Ceiling Roof System: High Clearance truss <br /> Bay 07:8'0" Ceiling:Designed to Support a St-el Ceiling Roof System: High Clearance truss <br /> Bay 08:8'0" Ceiling: Designed to Support a St-el Ceiling Roof System: High Clearance truss <br /> Bay 09:8'0" Ceiling: Designed to Support a St-el Ceiling Roof System: High Clearance truss <br /> Foundation <br /> Type:In Ground <br /> Concrete Floor:Yes-Supplied by Cleary(Concrete of included unless otherwise noted in writing in the Additional Building <br /> Components section) <br /> Column Anchoring <br /> Side Wall:Anchor Block(standard) <br /> End Wall:Anchor Block(standard) <br /> Corner Columns:Anchor Block(standard) <br /> Column Footing <br /> Side Wall:4"x 14" Precast Footing (Standard) <br /> End Wall:4"x 14" Precast Footing (Standard) <br /> Corner Columns:4"x 14" Precast Footing (Stand.rd) <br /> Roof Finish and Accessories for Building 2 <br /> Exterior Finishes <br /> Roof:Grand Rib 3 Plus <br /> I <br /> Ventilation <br /> Roof <br /> Ridge Cap <br /> Standard Ridge Cap: For venting the entire ridge <br /> C-500 <br /> v12/10 built with pride before the A\ is applied ` 11 of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.