|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00152
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2016 10:53:53 AM
Creation date
4/13/2016 10:53:49 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' <br /> I I <br /> Front Setback area S 72°57'40" E 254.01' r Side Setback area 4 <br /> • •I <br /> J%�/Jj %/e Rear <br /> O % i%% ;:i. <br /> Setback <br /> ;'/,////�.7i7�� area <br /> o c <br /> 71 �� 10 Feet / t- M <br /> Q Needs a W Location a la <br /> Q I w I ILI Survey %%% 1--Setback W <br /> 0 ^N 169.8' Line >} <br /> O = Proposed �� l70 <br /> CC N O Addition J ' O <br /> N 35. 2 io <br /> O ty <br /> r.- _ _ _ <br /> /, O <br /> I Z i' p Er,Ei <br /> .d 1 6 2 t$ <br /> is_r-0 I Side Setback area N 72°57'40" W APR <br /> 33' 33' I 6 <br /> I <br /> ONE app, NG a Devaopmea <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I,the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> Michael Elder 03/1 6/1 6 <br /> SIG ATURE: Owner/Agent <br />
The URL can be used to link to this page
Your browser does not support the video tag.