|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00185
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2016 2:09:39 PM
Creation date
5/3/2016 4:00:34 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00185
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Land Conservation Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Caller/Contact: Jon & Toni Skala Phone#: 608-839-1700 <br /> Landowner: Same Phone#: <br /> Contact email: skalapix @charter.net <br /> Project Address: 2546 Gaston RD <br /> Location: Township: Cottage Grove Sec:4 '/4 NW <br /> Parcel#: 0711-042-8290-7 <br /> Project Description: Demolish the existing SFR and construct a new SFR on the existing <br /> foundation. <br /> Planned Size of Disturbance: <43,560 ft2 Planned Size of New Impervious: 1 172 ft2 <br /> Land Conservation Division Response : <br /> Based on information above the project: —DOES* [DOES NOT require a penuit <br /> Determination Made By: ❑JAH JAS DDB F✓IJRT ❑RLS <br /> *Type of permit required: DEC [ES USM I SE PISS <br /> ❑Disturbance >4000 ft2 Slopes> 12% ❑Excavate/Fill>400 yds3 <br /> ❑Disturbing 100' of ditch/channel PI125' New road/driveway I Shoreland Zone disturbance <br /> PI Addition of 20,000 ft2 New Imp. PISubdivision Plat/CSM ❑Other: <br /> Basis for Determination: Project is not located in the shoreland zone and is exempt <br /> from Chapter 14 requirements under 14.47(2)(a). Slopes over 12% will not <br /> be disturbed based on topographic survey provided. <br /> Permit determination based upon information provided by caller/landowner. Changes in project size,scope or <br /> location may trigger changes to permit requirements. It is the responsibility of the owner to ensure all required <br /> permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.