Laserfiche WebLink
5/5/2016 <br /> C L AR 1� P.0 Box 930220 JOHNSON,MIKE <br /> Doc ID:89650 <br /> Verona,WI 53593-0220 8965020160505153846 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuitding.com Fax:(608) 845-7070 Cleary/Owner Project Proposal - Erected <br /> Truss Type <br /> r <br /> Note:Clearance may be reduced by finished floor height. <br /> Roof Pitch: 4/12 <br /> Roof Peak Height: 16'4" <br /> "A" =Actual Eave Height: 11'4" <br /> "B" = Truss clearance at heel and center: 10'0" <br /> Q m <br /> (Truss clearance = 1'-0" less than nominal eave height, in most cases. <br /> _ 4,100'+0` If nested purlins are used,truss clearance will be increased by 4") <br /> Standard Lower Chord Truss (SLC) <br /> Overhead Frameout & Headroom <br /> "D" = Bottom elevation(B.E.)of overhead door: 0'4" <br /> The bottom of all overhead doors(top of finished floor)are <br /> recommended to be placed at 4"above the 100'-0" mark(100'-4"). In <br /> building without paved floors, B.E.of doors may be lower-e.g.100'- <br /> 0". <br /> "E" = Height of overhead door: 8'0" <br /> Overhead door height = the height of the overhead door being placed <br /> tl- <br /> in this building. <br /> "F" =Available headroom: 1'8" <br /> Available headroom = the space available for overhead door tracks <br /> and openers. If a ceiling is installed, headroom will be reduced by <br /> about 1". Door headroom requirements must be confirmed with the <br /> door supplier. <br /> / ,. Headroom calculation formula: <br /> �► („B„)-(„D„)-(,.E") = („F„) <br /> . (Truss Clearance)-(B.E.of overhead door)-(Overhead door height) = <br /> (Available headroom) <br /> Example: <br /> (10'-0")-(4")-(8'-0") = (1'-8"of available headroom) <br /> C-110 <br /> v12/10 built with pride before the # is applied ® 12 of 14 <br /> • <br /> • <br />