|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00249
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2016 3:22:51 PM
Creation date
5/20/2016 3:22:43 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00249
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/13/2016 JUSTIN <br /> CLARY Verona,WI053593-0220 Doc ID:5129820 604 3164319 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuiiding.com Fax:(608)845-7070 Cleary/Owner Project Contract - Erected <br /> Truss Type <br /> Note: Clearance may be reduced by finished floor height. <br /> Roof Pitch: 4/12 <br /> Roof Peak Height 26'0" <br /> "A" =Actual Eave Height: 17' 8' <br /> Q co 0 <br /> "B" = Truss clearance at heel: 16' 0" <br /> j100+0" (Truss clearance= 1'-0"; less than nominal eave height, in most cases. <br /> If nested purlins are used,truss clearance will be increased by 4".) <br /> High Clearance Truss "C" = Truss clearance at center: 20' 1" <br /> (Truss clearance at the center of the bulding with a High Clearance <br /> truss will be greater than the clearance at the heel.) See page EM-41 <br /> to EM-46 in the price book for clearances. <br /> Contingencies <br /> Contract contingent on Permit. If building is not approved, Purchaser to receive down payment of$27,450 back in full. <br /> Approval is expected by 4/20/16 <br /> Overhead Frameout & Headroom <br /> 32/3 built with pride before the i1 is applied R 17 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.