|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00264
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2016 11:32:39 AM
Creation date
5/20/2016 3:28:19 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00264
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additional information for ASN 2016-AGL-6288-OE <br /> AERONAUTICAL STUDY NO. 2016-AGL-6288-OE <br /> MSL- Mean Sea Level IFR- Instrument Flight Rules RWY-- runway <br /> AGL- Above Ground Level VFR- Visual Flight Rules nm- nautical mile <br /> MDA- Minimum Descent Altitude <br /> Part 77 - Title 14 Code of Federal Regulations Part 77, Safe, Efficient Use and Preservation of the Navigable <br /> Airspace <br /> This temporary crane at 125 feet AGL/1029 feet AMSL has been identified as an obstruction under the <br /> standards of Title 14, CFR Part 77, as applied to Dane County Regional-Truax Field (MSN) in Madison, WI. <br /> The temporary crane would be located approximately 2,897 feet(0.47 nm) west of the proposed RWY 03 <br /> threshold at the MSN Airport. This crane will be used to install a monopole. MSN elevation is 886 feet MSL. <br /> Scheduled time of operation: This crane will be on site approximately 2 months within the next 6 months. <br /> The temporary crane has the following effects on IFR operations at MSN: <br /> Section 77.17(a)(3): A height that increases a minimum instrument flight altitude within a terminal area <br /> (TERPS criteria) the structure would have the following IFR impact: <br /> RNAV (GPS) RWY 03 increases the LNAV/VNAV DA by 61 feet from 1179 feet MSL to 1240 feet MSL. <br /> A National Flight Data Center (NFDC)Notice to Airmen(NOTAM) is required to modify the MSN instrument <br /> procedures for the entire duration of this crane activity. <br /> METHODS OF NOTIFICATION - It is required that the FAA by notified 3 business days prior to the <br /> temporary structure being erected and again when the structure is removed from the site. Notification should <br /> be made to this office through your registered e-filing account. Notification is necessary so that aeronautical <br /> procedures can be temporarily modified to accommodate the structure. <br /> NOTIFICATION IS REQUIRED AGAIN THROUGH YOUR REGISTERED E-FILING ACCOUNT <br /> WHEN THE TEMPORARY STRUCTURE IS REMOVED FROM THE SITE FOR NOTICE TO AIRMAN <br /> (NOTAM) CANCELLATION. <br /> The temporary crane does not constitute a substantial adverse effect because the structure would be temporary. <br /> The crane would not be a hazard to air navigation provided these additional conditions identified below are <br /> strictly met: <br /> 1) This temporary crane shall be marked with red light and flag. Red light must conform to chapter 5, red <br /> obstruction light system, (L-810 or equivalent and minimum 32.5 candelas) and flag must conform to chapter <br /> 3, marking guidelines, in accordance with FAA's advisory circular 70/7460-1L, Obstruction marking and <br /> Lighting. Copy of advisory circular 70/7460-1 L can be viewed and/or downloaded at https://oeaaa.faa.gov/ <br /> oeaaa/external/content/AC7074601 L.pd£ <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.