|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00264
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2016 11:32:39 AM
Creation date
5/20/2016 3:28:19 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00264
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r 1 c <br /> 5111110i. <br /> DANE <br /> COUNTY <br /> May 6, 2016 REGIONAL <br /> AIRPORT <br /> Scott Schroeckenthaler MADISON <br /> Zoning Inspector <br /> Dane County Zoning Division <br /> 210 Martin Luther King Jr. Blvd. <br /> Department of Planning and Development <br /> Room 116, City-County Building <br /> Madison, WI 53703-3342 <br /> Re: Permit Application under §78.06 Dane County Ordinance <br /> Monopole WI-00-1452 Madison Northport <br /> N43-07-51.34 W89-21-13.45 <br /> Dear Mr. Schroeckenthaler: <br /> Below are the conditions the Airport requests the Zoning Administrator establish for issuance <br /> of the permit. <br /> CONDITIONS APPLICABLE TO CRANE, MONOPOLE PERMIT: <br /> (1) Applicant shall comply with all conditions and recommendations set forth in <br /> the Determination Letter regarding Federal Aviation Administration Aeronautical Study No. <br /> 2015-AGL-3840-OE. <br /> (2) Prior to erecting the construction crane, applicant shall provide the on duty Airport <br /> Operations Supervisor, Dane County Regional Airport (office: 608.246.3397, cell: <br /> 608.235.1001), with the name and.telephone number of an individual(s) having authority over <br /> operation and placement of the crane while it is on the construction site and, upon request, <br /> shall arrange a meeting between Airport staff and the contractor that will be operating the <br /> crane. <br /> • <br /> (3) Applicant shall, at least three days before the crane height will reach 1,029 feet MSL, <br /> provide notice to Airport Operations. <br /> (4) At all times the highest point of the crane shall be marked during daylight hours with an <br /> orange and white checkered construction flag measuring at least three feet by three feet, and <br /> with a red obstruction light, with a minimum intensity of 32.5 candela, from two hours before <br /> sunset until two hours after sunrise and during periods of reduced visibility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.