Laserfiche WebLink
i. x.• <br /> y. • <br /> . • <br /> A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project. Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57' 40" E 254.01' r Side Setback area <br /> I ' 1 • Rear <br /> r 'Tf� %J/j/J� 1 Setback <br /> ..;_,,,������ ��/..i�� ����ii%�/.�j � area <br /> p ■ • .-•.-♦ �.: t •tea; O <br /> N— �� 10 Feel i F- co co <br /> M Needs _� W <br /> 0 � ____..___ Location w <br /> Q I W I S�UVey Setback <br /> r�i�/�/r Line'. <br /> N S[ O Proposed / ' 00 <br /> Addition . O• • <br /> iv 35. r- �•'. ; ; , is <br /> I Z <br /> 6/ 4,j J/461 0 <br /> • r ? <br /> Side Setback area N 72°57' 40" W <br /> I <br /> 33' 33' I I <br /> 1. I, the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s) of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning & Development to determine compliance with the county's zoning ordinances. This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> SHACHAR PELES 05/10/16 <br /> SIGNATURE: Owner/Agent <br />