|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00276
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00276
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2016 11:28:39 AM
Creation date
5/24/2016 10:54:48 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00276
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RAMAKER <br /> & ASSOCIATES, INC. <br /> May 11, 2016 <br /> PROJECT NARRATIVE- Ederer house <br /> The property owners of parcel 0907-I 0 I -87 10- I located on Hornung Rd in Roxbury, <br /> Wisconsin have plans to begin the construction of their new home. The construction process will <br /> involve of a new residential building with attached garage. Following the completion of the new <br /> home, the owner will proceed with the repair/stabilization of the surrounding ground as <br /> necessary. <br /> The overall direction of runoff flow is from northeast to southwest (towards an existing swale). <br /> The disturbance of soil on the site will be kept to a minimum and erosion control practices will be <br /> implemented to meet Dane County standards. Erosion control practices that will be provided <br /> include: silt fence, hay bales, and construction entrance tracking pad. The proposed <br /> construction site does not have any storm water conveyance systems. Therefore, the erosion <br /> control practices will provide the preventative measures necessary to avoid delivery of excess <br /> sediments off of the site. <br /> Stabilization of the construction site will be achieved by seeding and mulching all disturbed soil <br /> on-site. <br /> The proposed sequence of land disturbing activity during construction is outlined below. All <br /> dates provided are approximate and subject to change. <br /> 05/23/201 6: Install Erosion Control Measures <br /> 05/26/20 16: Disturb Ground <br /> 06/1 0/20 16: Apply Mulch/Temporary Seeding <br /> 7/1 5/20 16: Apply Permanent Seeding/Sod <br /> PREPARED FOR: <br /> Mark* Monica Ederer <br /> PO Box9 I <br /> Prairie du Sac, WI 53575 <br /> PROJECT NO. 3 I 115 <br /> 855 Community Drive,Sauk City,Wisconsin 53583 A Phone:608-643-4100 Fax:608-643-7999 <br /> Web:www.ramaker.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.