|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02334
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02334
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2016 11:56:15 AM
Creation date
5/24/2016 11:49:14 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02334
Town
Oregon Township
Section Numbers
36
AccelaLink
DCPCUP-2016-02334
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Non-metallic Mining Reclamation <br /> Application Checklist <br /> Applicant_ Zoning LCD <br /> Plan Requirement I Location in Plan-page number I I <br /> 1. Site information-maps of the site including the general location, property --rites <br /> 3 /704,3 7 <br /> boundaries,aerial extent,geologic composition and depth of the deposit,the <br /> distribution,thickness and type of soil,the approximate elevation of ground <br /> water,the location of surface waters and the existing drainage patterns. <br /> 2. Biological resources-plant communities and wildlife use at and adjacent 3 <br /> to the site. <br /> 7$15 7 <br /> 3. Existing topography-contour maps of the site at ten foot contour intervals. <br /> 4. Location of manmade features-on or near the site. . _ % � 3 7 <br /> 5. Plan view-(existing mines)showing the location and extent of land 7 <br /> previously affected by non-metallic mining. . <br /> 6. Post-mining land use-consistent with local land use plans/local zoning. / � 7 <br /> 7. Under exclusive agricultural zoning? <br /> cos. Reclamation measures-description of the proposed reclamation, including <br /> methods and procedures to be used and a proposed schedule for the <br /> completion of reclamation. <br /> ' F 3 1-n9'6 7 ._ <br /> 9. Proposed earthwork and reclamation-final slope angles, high wall <br /> reduction,benching and terracing. , <br /> 10.Methods of topsoil-topsoil substitute material removal and storage. 3 <br /> 11.Anticipated topography of the reclaimed site. 73 7 <br /> 12.Plan map that shows surface structures-after the cessation of mining. 3 7 <br /> 13.Estimated cost of reclamation. 7 41 3 <br /> 14.Revegetation plan-shall include timing and methods of seed bed 3 <br /> preparation, rates and kinds of soil amendments,seed application timing, <br /> methods and rates, mulching and any other techniques needed to accomplish <br /> soil and slope stabilization. <br /> 15.Standards for revegetation-may be based on the percent of vegetative <br /> cover, productivity, plant density,diversity or other applicable measures. <br /> 16.Erosion control and stormwater-chapter 14 requirements. <br /> 17.Description of interim reclamation., , 3 <br /> 18.Financial assurance-$1500/acre. <br />
The URL can be used to link to this page
Your browser does not support the video tag.