|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00254
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2016 2:17:53 PM
Creation date
6/3/2016 4:13:54 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00254
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
buffer" on the plan. In the event any of these areas are disturbed, additional erosion <br /> control measures will be required. <br /> 7. The plan includes a construction schedule as follows: <br /> Construction and grading is scheduled to begin April 25, 2016. <br /> The submitted phased restoration plan must be followed. <br /> All disturbed areas must be permanently restored, as noted in the plan, by <br /> March 7, 2017. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Water Resource Engineering. This permit will expire on the stabilization date included in the <br /> plan (March 7, 2017) and may be amended prior to permit expiration only. This review is for <br /> the erosion control requirements of Chapter 14, Dane County Code of Ordinances only and <br /> other approvals may be necessary. A permit card must be obtained from Water Resource <br /> Engineering and displayed onsite prior to disturbing ground. <br /> Cc: Yana Mavlyutov, P.E., D'Onofrio Kottke and Associates, Inc. (email) <br /> Eric Rortvedt, P.E., Wisconsin Department of Natural Resources (email) <br />
The URL can be used to link to this page
Your browser does not support the video tag.