Laserfiche WebLink
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 6/2/2016 <br /> Caller/Contact: Tammy Tuite Phone#: (608) 576-2761 <br /> Landowner: Paul & Tammy Tuite Phone #: <br /> Contact Email: latour.tammy @countyofdane.com <br /> Project Address: 6257 Mary Ida Dr, DeForest <br /> Location (Municipality): Tn. Burke Section: 03 1/4: NW <br /> Parcel #: 0810-032-1421-4 <br /> Project Description: 42' x 56' detached garage with concrete floor and associated grading <br /> Planned Size of Disturbance: 3000 ft2 Planned Size of New Impervious: 2352 ft2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:❑ DOES* DOES NOT Require a Permit <br /> Determination Made by: ❑JAN ❑JDB FI JAS ❑JAH ❑JRT ❑AJM EJRR <br /> Type of Permit Required: ['Erosion Control Shoreland Erosion Control ❑Stormwater Management <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125' Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> Q Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Site is within secondary shoreland zone within 1000' of pond, <br /> but project only involves small area, <4,000 sq.ft. No erosion control permit is <br /> required. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size, scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />