|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00291
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 3:47:42 PM
Creation date
6/10/2016 1:20:50 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00291
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-0 : % Public Health <br /> MAD!SON & DANE COLNTY Janel Heinrich, MPH, MA, Director <br /> H@czhih1 people end places Environmental Health Division <br /> 2701 International Lane, Suite 204 608 242-6515 Well&Septic <br /> Madison,WI 53704 608 243-0330 Lic. Establishments <br /> 608 242-6435 fax <br /> www.publichealthmdc.com <br /> April 19, 2016 Plan Review ID: 13-2016-00077 <br /> ANDREW MEINHOLZ <br /> MEINHOLZ EXCAVATING <br /> 6813 COUNTY HIGHWAY K <br /> WAUNAKEE, WI 53597- <br /> Reference: Tax Parcel No: 0811-123-4155-0 <br /> SW 1/4 of SW 1/4 of Section 12, <br /> Property Address: <br /> Subdivision: SAVANNAH VALLEY, Lot: 15 <br /> Owner Name: Ambiance Homes Inc <br /> Conditional approval for 600 gpd mound <24" granted. Plan approval expires April 19, 2018. <br /> Dear Andrew Meinholz: <br /> The submittal described above has been reviewed for conformance with applicable Wisconsin <br /> Administrative Codes, Wisconsin Statute and Dane County code ch. 46. The submittal has been <br /> CONDITIONALLY APPROVED. The owner, as defined in chapter 101.01 (10), Wisconsin <br /> Statutes, is responsible for compliance with all code requirements. <br /> The following conditions shall be met during construction or installation and prior to occupancy or <br /> use: <br /> New mound with 16" sand, 0.6 loading rate, 600 gpd. <br /> This system is to be constructed and located in accordance with the enclosed approved <br /> plans and with the following manuals: Mound Component Manual Version 2.0 SBD- <br /> 10691-P(N.01/01), Pressure Distribution Component Manual -Version 2.0, SBD-10706 <br /> -P (N.01/01). <br /> In the event this soil absorption system or any of its component parts malfunctions so as <br /> to create a health hazard, the property owner must follow the contingency plan as <br /> described in the approved plans. In addition, the owner must comply with the operation, <br /> maintenance and monitoring duties as described in section VIII of the component <br /> manual. A copy of this information must be given to the owner upon completion of the <br /> project. <br /> A Sanitary Permit must be obtained from Public Health Madison and Dane County <br /> where this project is located. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.