|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2016-00006
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPFLO-2016-00006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2016 1:55:05 PM
Creation date
6/10/2016 1:54:32 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2016-00006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
s�`" op A DANE COUNTY <br /> fc°" -j , +'it <br /> PLANNING DEVELOPMENT <br /> it ^ � �f % Room 116, City-County Building, Madison, Wisconsin 53703 <br /> V4 4.ticu #1. Fax (608) 267-1540 <br /> SCONIi� i. <br /> Housing& <br /> Economic Development <br /> (608)266-4270,Rm.362 <br /> May 26, 2016 <br /> Planning <br /> Dane County Parks (608)266-4251,Rm. 116 <br /> 5201 Fen Oak Dr Records&Support <br /> Madison WI 53718 (608)266-4251,Rm. 116 <br /> Floodplain Development Permit DCPFLO-2016-00006 Zoning <br /> (608)266-4266,Rm. 116 <br /> Falk Wells County Park Sugar River Pedestrian Bridge <br /> Town of Montrose, Section 3 <br /> Dane County Zoning Division has reviewed the information prepared with regards to constructing a pedestrian <br /> bridge at the former dam location crossing the Sugar River at Falk Wells County Park. The plan has been found to <br /> conform to Dane County Code of Ordinance, Chapter 17, Floodplain Regulations. The construction shall comply <br /> with the submitted plan. <br /> This permit is issued with the following conditions: <br /> • This development shall not obstruct flow, defined as development which blocks the conveyance of <br /> floodwaters by itself or with other development, causing any increase in the regional flood height; or <br /> cause any increase in the regional flood height due to floodplain storage area lost. <br /> • Bridge shall be designed and constructed to have a low flood damage potential. <br /> • Adequate floodproofing measures shall be provided to the flood protection elevation. <br /> Also, please be sure to obtain any State of Federal permits that may be required for projects within navigable <br /> waterways. <br /> Your cooperation is appreciated in this matter. <br /> Respectfully, <br /> Hans Hilbert <br /> Assistant Zoning Administrator <br /> CC: Dane County Land and Water Resources <br />
The URL can be used to link to this page
Your browser does not support the video tag.