|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2004-01360
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2004
>
DCPZP-2004-01360
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 4:02:01 PM
Creation date
6/15/2016 11:05:54 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2004-01360
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY <br /> o rff,,,,�I LAND CONSERVATION DEPARTMENT <br /> w 1,40 <br /> �� � LYMAN F.ANDERSON AGRICULTURE&CONSERVATION CENTER <br /> �clriznj 1 Fen Oak Ct.,Rm.208,Madison,Wisconsin 53718-8812 <br /> PH:608/224-3730•FAX:608/224-3745 <br /> www.co.dane.wi.us/landconservation/ <br /> DATE: October 25, 2004 <br /> TO: Peter Conrad <br /> Zoning Administrator <br /> FROM: Aicardo Roa-Espinosa, Ph.D. <br /> Urban Conservationist <br /> RE: Grace Evangelical Church -Erosion Control and Stormwater Management <br /> Plan, ES2004-0340 <br /> The submitted Erosion Control and Stormwater Management plan meets the needs of the site and <br /> includes the following conditions: <br /> 1. The site will only be accessed off Buckeye Road by a stone-tracking pad. The pad will be <br /> a minimum of 50' long x 24' wide x 12"deep and will be constructed of 3-inch clear <br /> stone. No other site access may be used. Material deposited in the road will be cleaned <br /> up at the end of each workday. <br /> 2. Silt fence will be installed prior to grading the disturbed areas; as shown on page 1 of the <br /> plan. The details are on page two of the plan. All silt fence will be maintained until the <br /> site is stabilized. <br /> 3. Two connected sediment/detention basins will be constructed prior to any other grading. <br /> Sediment must periodically be removed from the basin during construction to maintain <br /> functionality. <br /> 4. Two stone trenches or bio-filtration areas filled with clean lime stone will be constructed <br /> in the parking lot as shown in the plan. <br /> 5. Grading must be confined to the areas shown on the plan. <br /> 6. The plan includes a construction schedule as follows: <br /> Grading and construction is planned to begin October 25, 2004. <br /> All disturbed areas on the pond and swales will be seeded and mulched(or <br /> erosion matted) by November 15. 2005. <br /> All disturbed areas on the site will be seeded and mulched (or erosion matted)by <br /> May 15, 2005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.