Laserfiche WebLink
BOA 10/27/94 Minutes <br /> Page 6 <br /> 4) . Appropriate Winter stabilization measures be installed and <br /> maintained until vegetation is established. <br /> 5) . Completion and certification deadline June 1, 1995. <br /> FINDING OF FACT: <br /> 1) . Applicant proposes substantial addition and will attach <br /> existing garage to residence. <br /> 2) . Property has steep slope towards lake. <br /> 3) . Existing structure is cottage with two bedrooms, proposal is <br /> to convert to year round and expand for growing family. <br /> 4) . Numerous nonconforming structures in area and numerous <br /> variances have been granted. <br /> 5) . Special Exception Permit is for finish grade, drainage <br /> patterns and soil erosion prevention after construction. <br /> CONCLUSION: <br /> 1) . Variance preserves the zoning ordinance as much as possible <br /> without injustice to applicant. <br /> 2) . Variance is not contrary to rights of others or to the public <br /> interest. <br /> 3) . The project as planned, with specified conditions; will not <br /> result in substantial detriment to navigable waters by erosion, <br /> sedimentation, impairment of fish or aquatic life, or safe and <br /> healthful conditions. Motion carried - 4-0. <br /> #2578 . Appeal by Wesley Waite for a Special Exception Permit as <br /> provided by Section 11. 05 (3) to permit filling, grading, etc. <br /> within 300 feet of Lake Kegonsa at 2256 CTH AB being parts of Lots <br /> 9 and 10, Washington Park Section 23 , Town of Dunn. <br /> IN FAVOR: S. Poulsen, T. Harrison OPPOSED: --- COMMUNICATION: <br /> Town Board, County Highway <br /> GASKILL\DREPS to grant, with conditions, permit to fill and grade <br /> as proposed for lot drainage after construction of new single <br /> family residence. <br /> CONDITIONS: <br /> 1) . That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed with the <br /> Zoning Department before commencement of any work. <br /> 2) . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Section 11. 05 (4) of Dane County Zoning <br /> Ordinance. <br /> 3) . That there be filed with the Zoning Department a Certificate <br /> of Compliance by a licensed engineer at the completion of the <br /> project. <br /> 4) . Appropriate winter stabilization measures be installed and <br /> maintained until vegetation is established. <br /> 5) . Completion and certification deadline of June 1, 1995. <br />