Laserfiche WebLink
ze 4111M11.111111.111111111111111111111111111011111.1111.11111..111.m.....mom <br /> /. j <br /> DANE COUNTY <br /> ,..., LAND CONSERVATION DEPARTMENT I LAN N� <br /> yr,�T, <br /> ' ,. I' FEN OAK RESOURCE CENTER <br /> I R REUSI <br /> 1 pry � ,Y� 1 Fen Oak Ct.,Rm. 208'Madison,Wisconsin 53718-8812 <br /> ' `lF ��%' <br /> 8 i PAVED I <br /> t :--- PH: 608/224-3730•FAX:608/224-3745 ! I THE INC <br /> I iR FILL. <br /> H AND P <br /> �' CATED E <br /> I ILABLE. <br /> ' <br /> DATE: January 29, 2002 ''E TO BI <br /> PAVE <br /> TO: Tim Gregorius , PA F <br /> Dane County Zoning a ,.. \ SURFS <br /> 11 REMAIN <br /> FROM: Aicardo Roa, Ph.D ilIllfi, 'SHALL <br /> Urban Cons-. •• '• ia i ..r- <br /> AllWar <br /> RE: CORPORATE a�1' �''oss Menard Site <br /> EROSION CO ' OL P • #2-737 <br /> I have received Erosion Control Plan#2-737. The plan presented does comply with Dane County <br /> (} finance Chapter 14, and section 14.54. <br /> 1 <br /> 1. The plan adheres to the minimum soil loss, which is 7.5 tons/acre/year. <br /> 7//3 <br /> 2. The site has a basin located at the southeast part of the site. The basin is designed to <br /> reduce soil loss based on the reduction from the soil loss calculated by USLE and the <br /> allowed 7.5 tons/acre/year and the 80% post-development sediment reduction. i <br /> Time Schedule: <br /> February 15, 2002 Install the rock tracking entrance; begin grading; any soil piles shall <br /> be seeded and mulched if the pile will remain on the site for more <br /> than 30 days; install tracking pad, install silt fence, although it is not 7 <br /> considered necessary. <br /> February 18, 2002 Begin excavation and construction of the building 26 <br /> il <br /> March 15, 2002 Seed and mulch the basin and disturbed areas with permanent i <br /> seeding at a rate of 4-pounds/1,000 sq. feet; mulch at a rate of 80- <br /> pounds/1,000 sq. feet. ' <br /> April 15, 2002 Final seed and mulch of all construction areas. Complete seeding <br /> and mulch with winter wheat or rye if the seeding occur late June <br /> and/or July. <br /> June 15, 2002 Site considered stable and end of construction. <br />