|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-04957
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-04957
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 11:29:22 AM
Creation date
6/22/2016 11:29:21 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
04957
Town
Medina Township
Section Numbers
12
AccelaLink
DCPREZ-0000-04957
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• MINERAL EXTRACTION <br /> Requirements for Application, Operation and Reclamation <br /> Sec. 10.12 (2) (a) and 10.126 (2) (a) <br /> Dane Co. Zoning Ordinance <br /> Mineral Extraction includes: quarrying, borrow pits, or, other processing or removal of <br /> mineral resources including removal of topsoil/black dirt and fill dirt or clay. <br /> APPLICATION SHALL INCLUDE: <br /> 1. A written statement of the operation containing the following: <br /> a. Description of the operation. (Sand/gravel; stone quarry; lime; black dirt; etc.) <br /> b. Date operation will commence. <br /> c. Sources, quantity and disposition of water to be used. <br /> d. Estimated date for completion of excavation. <br /> e. Estimated date for completion of reclamation (see reclamation below) . <br /> f. Existing use of the land. <br /> g. Proposed use after reclamation. <br /> 2. Site plan showing: <br /> a. Location of proposed operation. <br /> b. Excavation area showing proposed, final elevations. <br /> c. All residences within 600 feet. <br /> d. Location of lakes, rivers, streams, etc. • <br /> e. Existing and proposed roads and drives. <br /> 3. Letter of approval of the site by the Town Board of the town affected. <br /> (if access will be located on town road) <br /> • <br /> OPERATION REQUIREMENTS: • <br /> a. Topsoil shall be saved. <br /> b. Excavations below the grade of public street or highway shall be setback from said <br /> street or highway a distance not .less than that required for buildings and struc- <br /> tures under this ordinance. <br /> c. Excavations made to a water producing depth shall be not less than 3 feet measured <br /> from the low water mark. <br /> d. Zoning permits are required for buildings, additions, etc. <br /> RECLAMATION: • <br /> a. All final slopes around the area- shall be flatter than a 3:1 slope in sand, gravel <br /> or borrow pit operation or in a safe angle or repose in a quarrying operation. <br /> b. All final slopes and pit areas shall be covered with topsoil from the original site <br /> and seeded to prevent erosion. <br /> c. The area shall be cleared of all debris and be left in a workmanlike condition. <br /> d. Reclamation is subject to approval of the Dane County Zoning Committee or its agent. <br /> OTHER: <br /> a. If land is zoned A-i or A-2 a conditional use permit is required. <br /> b. If land is zoned A-1 Exclusive 6r A-3, re-zone to an appropriate district and a <br /> conditional use permit are required. <br /> c. The conditional use permit shall be for the period of time specified in the appli- <br /> cation or as modified by the Agriculture, Environment & Zoning Committee. <br /> d. If site is within a shoreland, wetland or flood zone other regulations will apply. <br /> • <br /> • <br /> • <br /> Ofi Air iWP-rtii6°--CI <br /> /�- 7-7o <br />
The URL can be used to link to this page
Your browser does not support the video tag.