|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00450
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00450
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 3:23:47 PM
Creation date
6/23/2016 10:05:15 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00450
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Land Conservation Division <br /> 0 Dane County Land &Water Resources Department <br /> Patrick J.Sutter,County Conservationist <br /> DATE: July 8, 2009 <br /> TO: Bay View Heights, Inc. <br /> Owner <br /> FROM: Josh Harder <br /> Erosion Control Engineer <br /> RE: Town of Dunn Storm Shelter—Erosion Control and Stormwater <br /> Management Plan,ES2009-0119 <br /> The submitted erosion control and stormwater management plan meets the needs of the site. <br /> The plan includes the following requirements: <br /> 1. The site may only be accessed off Norman Drive using a stone tracking pad. The pad <br /> must be a minimum of 50' long x 24' wide x 12" deep and be constructed of 3-inch clear <br /> stone.No other site access may be used and material deposited in the road will be <br /> cleaned up throughout and at the end of each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary, including the down slope of all soil stockpiles. The silt fence must be <br /> maintained until the site is vegetated and stabilized. <br /> 3. A sediment basin must be constructed in the location shown on the plan prior to other <br /> grading. The stone weeper and tile drain outlets must be constructed concurrent with <br /> basin construction. <br /> 4. Disturbed slopes steeper than 3:1 will be covered with erosion mat(WI DOT Class I, <br /> Type A). All swale bottoms will be covered with erosion mat(WI DOT Class I, Type B) <br /> during final stabilization. <br /> 5. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur outside the limits of disturbance identified on the plan. <br /> 6. Culvert and pipe outfalls must be protected by rock riprap. The riprap must be installed <br /> such that it forms a"bowl"with a depth of at least 12-inches to dissipate runoff energy. <br /> 7. As-built plans and certification,performed by a professional engineer, will be required <br /> for all permanent stormwater management practices and facilities. <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH: 608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.