Laserfiche WebLink
7 -O: s I'-L, f L. Coo A iy G./a-r[c3 R E 6 v—'7o i tf. O02s <br /> FROM,' r &rn 1.s Voc-i'1 CsE OF <br /> Municipal Building / r P.O. Box 45 <br /> 130 SOUTH PARDEE STREET � r' =—�' MARSHALL WISCONSIN 53559 <br /> -•� r (608) 655-4017 <br /> OF h)GE C <br /> • <br /> April 9, 1991 <br /> To: Mr. Dennis Volpe <br /> 5691 Oak Park Road <br /> Marshall, WI 53559 <br /> Frp, : Superintendent of Utilities Marshall, WI <br /> Subject: Operation Well located at Quarry off Oak Park Road operated by <br /> Wingra Stone <br /> On March 26th, 1991 I was informed of a well to be drilled and operated at <br /> the above location. After reading the provisions of the conditional approval <br /> of operation of the well by the DNR, I made a visit to the site. <br /> I met with the site foreman of Wingra, informed who I represented and <br /> reason for visit. At that time I was told well was not being used and that <br /> I would be notified when well was in operation to enable me to check <br /> any significant drop in the pumping level of the village's wells. <br /> I walked over to site of well to inspect. At this the pump was in <br /> operation. I then left to check my pumping levels. <br /> I waited to hear from Wingra without response until April 2nd, 1991. <br /> At this I revisited the well site on my own initiative. With the foreman <br /> escorting to the site of well. At this time found two violations of the <br /> condition use approval of well. These violations were: <br /> 1. No metering or timing device to determine amount being pumped. <br /> 2. A cross connection being the discharge of well pump half <br /> submerged in wash water. <br /> After noting these violations I went back to office, and notified <br /> Robert W. Schaefer, Private Water Supply Section of the D.N.R. about <br /> the two violations. He said this problem would be taken care of promptly. <br /> Stephen Swiggum <br /> / <br /> SS/ce <br />