|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00141
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 2:08:01 PM
Creation date
6/24/2016 2:07:53 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00141
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
111 <br /> 1 <br /> �'a-- , 1'a PLANNING DANE COUNTY <br /> >, I <br /> 4 �}r� . ,1<�7 ; �% Room 116, City County Building, Madison, Wisconsin 53703 <br /> x'1, -_ice# Fax (608)267-1540 <br /> 11 S,s C-O 5�-- <br /> Housing& <br /> Economic Development <br /> April 19, 2016 (608)266-4270,Rm.362 <br /> Mr.Kim O. Hubred Planning <br /> Ms.Kae L.Hubred (608)266 4251,Rm.116 <br /> 1889 Hubred Lane Records&Support <br /> Deerfield WI 53531 (608)266-4251,Rm. 116 <br /> REMINDER NOTICE: New barn addition at 1889 Hubred Lane Zoning <br /> (608)266266,Rm.116 <br /> Parcel# 018/0711-234-9502-6 <br /> Dear Mr. and Ms.Hubred: <br /> On March 11,2016 the Dane County Zoning Division observed the construction of an addition to the existing barn <br /> on your property. <br /> Section 10.25(2)(a)of the Dane County Code of Ordinances(DCCO)states,"(2)Zoning permits. (a)No new <br /> building shall hereafter be erected,and no existing building shall be added to, structurally altered,moved or <br /> changed in use,nor shall any nonconforming building be repaired or restored, in any district,until a zoning permit <br /> has been issued,except as otherwise provided by law or ordinance." <br /> Section 12.06(1)(k)of the DCCO states that no permit fee is required for your project. <br /> 12.06 EXEMPTIONS FROM FEES. (1)The following types of petitions and permits shall be exempt from fees: <br /> "(k)Zoning permits for agricultural accessory buildings involved in the operation of a farm on zoning lots over 35 <br /> acres in size." <br /> Please find the enclosed permit application, site plan,floor plan,Access Dane page, copy of Section 12.06(1)(k), <br /> and a return envelope. <br /> Please submit a Dane County zoning permit within ten(10)days of the date of this letter,April 29,2016. <br /> Sincerely, / <br /> Russell L.Bartlett,bartlett@countyofdane.com, 608-267-3960,Zoning Inspector, County of Dane t/ <br /> Cc: Town Clerk . <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.