Laserfiche WebLink
10. All berms are seeded and mulched. The berm at the east side of the property has stable <br /> �r vegetation and drains to the south of the property. <br /> 11. These soils, due to the stripping procedure,will be compacted. All the areas to be <br /> determined post-mining land use need to be deep-tilled or sub-soiled to allow the vertical <br /> permeability to function. <br /> Quarry Reclamation <br /> 1. The reclamation plan is to return the site to agriculture and row crops. <br /> 2. The topsoil shall be free of trees, brush, and other woody materials. <br /> 3. The backfill of the excavated pit will be done with clean, uncontaminated topsoil during <br /> the operation. <br /> 4. Redistribute the topsoil stockpiles from the berms, returning site grades to the <br /> predevelopment condition. <br /> 5. The topsoil shall be deep-tilled to increase infiltration and reduce the compaction that <br /> occurred during the backfilling of the site. <br /> Time Schedule: <br /> DATE ACTIVITY <br /> June 1, 2004 Strip topsoil, separate subsoil and overburden. Construct berm and <br /> terraces. <br /> June 15, 2004 Permanent seeding and mulching with WDOT#720 at a rate of 7 pounds <br /> per acre within seven day of completion of the grading. Do not use <br /> fertilizer with phosphorous. <br /> Aug. 15, 2004 Seeding established. Repair the areas where new vegetation is needed. <br /> Sept. 1, 2004 Final reclamation of some of the areas <br /> The construction site will follow the plan according to the schedule approved by Dane County <br /> Land Conservation. The permit will expire on the final reclamation date included in the plan, and <br /> can only be amended prior to permit expiration. <br /> This review is only for the requirements of Chapter 14, Dane County Code of Ordinances. Other <br /> approvals may be necessary. The applicant must obtain a permit card from the Dane County <br /> Zoning counter and display it on the site prior to disturbing ground. It is recommended that you <br /> contact Zoning prior to picking up the permit card to ensure that they have received a copy of this <br /> review. <br /> 2 <br />