Laserfiche WebLink
August 15th Seeding established and repair the areas where new vegetation is <br /> needed. <br /> September 1st Inspect all erosion control measures to insure effectiveness. <br /> NOTE: <br /> The site is internally draining, no road ditches are present at the site, no cross <br /> section, runoff velocities, culverts, are applicable to this site. <br /> Contact Person for Erosion Control Plan: <br /> Tim Geoghegan <br /> Yahara Materials, Inc. <br /> P.O. Box 277 <br /> Waunakee, WI 53597 <br /> Telephone: 608-849-4162 <br /> Sincerely, <br /> Tim Geoghegan <br /> Supervisor <br /> YAHARA MATERIALS, INC. <br /> (11V <br /> 3 <br />