|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02338
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 9:25:16 AM
Creation date
6/28/2016 8:57:33 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02338
Town
Mazomanie Township
Section Numbers
10
AccelaLink
DCPCUP-2016-02338
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
co, <br /> YAHARA <br /> MATERIALS P.O. Box 277 Waunakee,Wisconsin 53597-0277 Phone 608-849-4162 Fax 608-849-5062 <br /> Yahara Materials Inc. <br /> Erosion Control Plan <br /> Philip Schadler Property <br /> Location: Philip Schadler Property, Mazomanie, Wisconsin <br /> The site is described as the NE t/4 of the NE �`/4, Section 10 <br /> T8N-R6E,Mazomanie Township,Dane County, WI <br /> Type of Work <br /> to be performed: 1. Construction of access road with 100' x 30' x 12"Breaker Run Stone <br /> to prevent tracking mud onto the roadway. <br /> 2. Stripping and piling of topsoil and sub-soil's to construct berms on <br /> perimeter of site. All stockpiled soils would be graded and shaped to <br /> minimize slopes. <br /> 3. Seeding and mulching of stockpiled soils. Stockpiled dirt and berms <br /> would be treated with CFM 2000 Polymer seed and mulch for maximum <br /> erosion control. <br /> 4. Construct holding ponds on site to collect runoff. <br /> 5. A 100' grass buffer would be left around perimeter of property to <br /> protect highway right of way and adjoining properties from erosion. <br /> 6. Upon completion of Phase 1 and prior to total restoration, bottom of <br /> working area would be sub-soiled to allow run-off to settle out. <br /> Time Table <br /> of Operation: Work would begin in June 2001 and all erosion control measures would <br /> be completed with in 60 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.