Laserfiche WebLink
• <br /> glow <br /> • STORM WATER POLLUTION PREVENTION PLAN <br /> • <br /> • <br /> Spills and Contamination: <br /> Any ground contact petroleum product from routine operation was removed and properly <br /> disposed of offsite. <br /> Operation sites are inspected by the plant operator for contamination before leaving the site. <br /> . Clean-up is implemented if necessary. <br /> Description of Inspections: <br /> Inspections are recorded on the Environmental Programs Daily Tracking form. (A copy of the <br /> Environmental Programs Tracking form is included.) <br /> The Spill Prevention Control and Countermeasures (SPCC)plan summarizes the petroleum <br /> products handling,management,repairs, and maintenance to petroleum equipment. These same <br /> procedures and containment type structures apply to the storm water plan also. Potential areas of <br /> contaminated discharge are inspected daily by the plant operator as outlined in the SPCC <br /> Inspection outline. (A copy of the SPCC Inspection Outline is included.) This inspection <br /> procedure and any maintenance performed on equipment affecting these areas are documented on <br /> the Environmental Programs Tracking form in the SPCC section. <br /> Monitoring. <br /> Facility Contact: <br /> The facility contact is responsible for development and implementation of the pollution <br /> prevention plan. . <br /> Facility Contact—Print Name Title <br /> 4or <br /> • <br />