Laserfiche WebLink
RECLAMMATION PLAN <br /> The parcel south of the existing quarry, (owned by Emden <br /> A. and Laura S. Schey) , was to be excavated for topsoil and <br /> clay material . This material was to be placed as capping <br /> material for the City of Sun Prairie Landfill . The closure <br /> procedures for this landfill had begun in late 1990, and some <br /> grading and hauling activity had already taken place prior to <br /> the violation notice of the Dane County Zoning Ordinance. <br /> As revealed in the enclosed soil boring logs, there is <br /> a deposit of topsoil and clay material to a depth ranging <br /> from 2 .20 feet to approximately 4 . 5 feet . The enclosed Site <br /> Plan reveals the existing and proposed contour elevations. <br /> The construction schedule for the landfill closure <br /> involves the placement of a clay cap followed by the <br /> placement of the topsoil layer. It is estimated that the <br /> topsoil and clay material could be excavated and hauled with <br /> 10 working days. After this material has been excavated and <br /> hauled to the landfill site, the contractor will grade the <br /> existing site to match the proposed contours. <br /> The owner of the parcel has stated that the underlying <br /> rock would be extracted within the next 5 to 7 years. After <br /> such time the floor elevation of the quarry would have a <br /> topsoil layer with vegetative cover. <br />