Laserfiche WebLink
NOTES <br /> 1. The borings were performed with a hand bucket auger and the soils were <br /> visually iuentified. <br /> 2. Borings 1 through 4 were performed on Hovemuer 8, 1990. Borings 5 through <br /> 11 were performed on November 19, 1990. <br /> 3. The holes were filleu in after water level check. <br /> 4. The bounuary lines shown on the Soil Boring Records between aifferent <br /> soil strata are approximate ana may ue graaual . The uriller' s field <br /> logs contain soil conditions. as interpreted by the drilling personnel , <br /> of soils between samples based on the equipment performance anu the soil <br /> cuttings. The Soil Boring Records contain the soil conditions as inter- <br /> preted by a geotechnical engineer after review of the uriller' s fielu <br /> logs and soil samples. <br /> b. The Soil Boring Records area part of the written report. When this in- <br /> formation is to be included in bidding or reference uocuments, the <br /> written portion of the report, along with the Soil Boring Recoras, must <br /> be bound together as a separate document or section of the project speci- <br /> fications. <br /> LEGEND' <br /> ❖.•..I Topsoil <br /> Brown Lean Clay (CL) <br /> ri <br /> SOiL BORING RECORD <br /> PROPOSED CLAY 8ukRuW SOURCE + � <br /> NORTH BIRD STREET <br /> SUN uuAI1 IE, bil SC U<J j <br /> SOILS u ENGiNEEkING SERVICES, INC. f N <br /> HAuiSUra, W.SCu NS.N <br />