|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00471
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2016 4:13:38 PM
Creation date
6/29/2016 1:32:52 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00471
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Land Conservation Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Caller/Contact: Fadi Hayek, The Renschler Company Phone#: <br /> Landowner: Richard & Sherley Warmka Phone#: <br /> Contact email: <br /> Project Address: 302 W Beltline Highway <br /> Location: Township: Town of Madison Sec: 36 1/4 NW <br /> Parcel#: 0709-3624273-4 <br /> Project Description: Construct a 1000 sq. ft. addition and 1000 sq. ft. parking area. <br /> Planned Size of Disturbance: <4000 ft2 Planned Size of New Impervious: 2000 ft2 <br /> Land Conservation Division Response : <br /> Based on information above the project: ❑DOES* ✓❑DOES NOT require a permit <br /> Determination Made By: ❑JAH ❑JAS DJDB DIRT ❑RLS <br /> *Type of permit required: DEC ❑ES ❑SM ❑SE ❑SS <br /> ❑Disturbance >4000 ft ❑Slopes> 12% ❑Excavate/Fill>400 yds3 <br /> ❑Disturbing 100' of ditch/channel 0125' New road/driveway DShoreland Zone disturbance <br /> ❑Addition of 20,000 ft2 New Imp. ❑Subdivision Plat/CSM DOther: <br /> Basis for Determination: Project is not in a shoreland zone and does not meet permit <br /> triggers of 14.45. Property is zoned commercial. Land disturbance must be <br /> limited to less than 4000 sq. ft. or permits will be required. <br /> Permit determination based upon infonmation provided by caller/landowner. Changes in project size, scope or <br /> location may trigger changes to permit requirements. It is the responsibility of the owner to ensure all required <br /> permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.