Laserfiche WebLink
ca , to Dane County Planning and Development Department <br /> s Room 116,City-County Building,Madison,Wisconsin 53703 <br /> Fax (608) 267-1540 <br /> ' Housing& <br /> 183%, Economic Development <br /> (608)266-4270,Rm.362 <br /> October 1, 2009 <br /> Planning <br /> Mr. Allan A. Abel, Sr. (608)266-4251,Rm. 116 <br /> 4406 County Highway TT <br /> Sun Prairie WI 53590 (608)2 Support <br /> 6-42 , .16 <br /> NOTICE TO SUBMITA LOCATION SURVEY Zoning <br /> (608)266-4266,Rm. 116 <br /> Location: 4406 County Highway TT, Lot 1, Certified Survey Map #12332, Town of Sun Prairie, <br /> Section 32, SE 1/4 SW 'A. <br /> Parcel#: 058/0811-323-9565-0 <br /> Your zoning permit(#200900499)was issued with a condition requiring that a location survey be submitted <br /> to this office after the building's location was established, and before work continued. In your case,a <br /> location survey by a licensed surveyor is required to verify distance for the minimum required setback to the <br /> rear lot line and to the building to the north. Please submit this location survey by mail or hand-deliver to <br /> our office,attention to Russell L.Bartlett. It must reach me within two weeks of the date of this letter or a <br /> citation will be issued for each day of non-compliance. <br /> Continuation of work without submitting a location survey has constituted a violation of the zoning <br /> permit conditions and of the Dane County Code of Ordinances, Chapter 10.25 (see below), and may result <br /> in further enforcement actions. <br /> 10.01 (30m)Location survey, as indicated in this ordinance, refers to survey information prepared by a <br /> licensed surveyor indicating the location of property lines and building location distances from those <br /> property lines for the specific portions of the building indicated in this ordinance. Such surveys are not <br /> required to provide all the parcel information set forth by Wisconsin Administrative Code Chapter A-E 7.02 <br /> Minimum Standards for Property Surveys item A-E 7.01(2) but may exclude unnecessary information as <br /> permitted in A-E 7.01(2)and provide only the information required by the zoning ordinance but such <br /> information must comply with the accuracy standard required by A-E 7.06 Measurements. <br /> 10.25(3)(a) 1.A location survey as defined herein shall be submitted to the zoning division for all <br /> construction, which will be located less than 10'from required setback lines. The survey shall be done at <br /> the time when foundations or basement walls are completed, or when slab is poured. Such survey shall <br /> be submitted to the zoning office prior to the continuation of work on the project. <br /> Thank you for your cooperation, and I look forward to receiving the location survey. <br /> Sincerely, <br /> Russell L.Bartlett,bartlett@co.dane.wi.us, 608-267-3960,Zoning Inspector, County of Dane <br /> Enclosures: Copy ZP20090499 <br /> ***NOTICE TO APPLICANT*** <br /> Return envelope <br />