Laserfiche WebLink
9/25/2015 <br /> CCEARv I Verona, 930220 <br /> 93-0220 D D:D388201925094459 8 01 <br /> BUILDING CORP. Phone: (608) 845-9700 <br /> Cleary8uilding.com Fax:(608) 845-7070 Cleary/Owner Project Contract - Erected <br /> Side Wall 1 on Building 1 <br /> Siding:Grand Rib 3 Plus <br /> Wainscot: None <br /> Eave Filler Strips:None <br /> Treated Plank Filler Strips: None <br /> Ventilation <br /> Side Wall 1 on Building 1 <br /> Overhang: 18"Aluminum soffit(Sidewall)with vented soffit <br /> Insulation Baffle will be used with this overhang to prevent ceiling insulation from moving into the soffit area. <br /> Accessories <br /> Side Wall 1 on Building 1 <br /> None <br /> Interior Finishes/Insulation <br /> Side Wall 1 on Building 1 <br /> Condensation Control: None <br /> Insulation:None <br /> Interior Nailers:2"x 4" Nailers 36"oc <br /> Liner: Liner Panel Steel (Snow color only) <br /> Distance from 100'+0"mark to bottom of liner plus:0'4" <br /> Bottom Trim: Not Included <br /> 10 111111111111111111111.1111111. — <br /> Cv) <br /> South Side Wall 2 on Building 1 <br /> Note:These colors are as close to the actual colors as permitted by printing.Actual metal samples must be reviewed with your Sales <br /> Specialist.Colors vary depending upon position and angles. <br /> Exterior Finishes <br /> Side Wall 2 on Building 1 <br /> Siding:Grand Rib 3 Plus <br /> Wainscot: None <br /> Eave Filler Strips: None <br /> Treated Plank Filler Strips: None <br /> Ventilation <br /> Side Wall 2 on Building 1 <br /> Overhang: 18"Aluminum soffit(Sidewall)with vented soffit <br /> v12/10 built with pride before the tri is applied 3 of 18 <br />