Laserfiche WebLink
excavation area of the quarrying activity, the dates of blasting at the quarry. Said notification <br /> shall be provided more than 72 hours prior to blasting. <br /> 14. The operator shall use spray bars(water) in the crushing process to reduce dust. Use of spray <br /> bars is not required when the temperature is below freezing. The operator shall spray the site <br /> with water if and when needed to control dust. <br /> 15. The operator shall require all trucks, excavation,crushing.screening and washing equipment to <br /> have muffler systems which meet or exceed then current industry standards for noise abatement. <br /> 16. The applicant shall meet DNR standards for particulate emissions as described in NR 415.075, <br /> Wisconsin Administrative Code. <br /> 17. Owner/operator shall maintain liability insurance coverage in the amount of$5,000,000 and <br /> maintained at that level until the quarry is closed or CUP 2346 expires. Dane County and the <br /> Town of Christiana shall be named as additional insureds on this insurance policy. Copies of <br /> appropriate insurance policies shall be filed with the Town of Christiana.. <br /> 18. The Dane County zoning administrator or designee may enter the premises of the operation to <br /> inspect those premises and to ascertain compliance with these conditions or to investigate an <br /> alleged violation. If the operation is not in reasonable compliance with the terms of this <br /> approval, such approval is subject to amendment or revocation. <br /> 19. The operator must post a copy of this conditional use permit(#2346), including the list of <br /> conditions,on the work site. <br /> (Questions? Contact Pam Andros, Senior Planner,Dane County Planning& Development— <br /> 608-261-9780) <br /> H:\Zoning\ZLR\PHFORMS\2016\Draft Conditions 2346.docx <br /> 2 <br />