|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02346
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 1:32:07 PM
Creation date
7/6/2016 1:30:45 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02346
Town
Christiana Township
Section Numbers
14
AccelaLink
DCPCUP-2016-02346
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 9. These soils,due to the stripping procedure,will be compacted. All of the areas to be <br /> determined post-mining land use need to be deep-tilled or sub-soiled to allow the vertical <br /> permeability to function._. <br /> Quarry Reclamation <br /> 1. The reclamation plan is to return the site to agriculture and row crops. <br /> 1? � p <br /> 2. The topsoil will be free of trees,brush, and other woody materials. <br /> 3. The backfill of the excavated pit will be done with clean,uncontaminated topsoil during <br /> the operation. <br /> 4. Redistribute the topsoil stockpiles from the berms,returning site grades to the <br /> predevelopment condition. <br /> 5. The topsoil will be deep-tilled to increase infiltration and reduce the compaction that <br /> occurred during the backfilling of the site. <br /> • <br /> I . Time Schedule: <br /> September 15,2005 Strip topsoil,separate subsoil and overburden. Construct berm and <br /> terraces. <br /> May 30,2005 Permanent seeding and mulching <br /> • <br /> This Cycle of striping separation of the overburden and construction of the <br /> berm will be done every year until year 2040. The reclamation of the site <br /> ® will proceed accordingly in the same manner. <br /> ■ <br /> The construction site will follow the plan according to the schedule approved by Dane County <br /> Land Conservation.The permit will expire on the final reclamation date included in the plan,and <br /> can only be amended prior to permit expiration. <br /> This review is only for the requirements of Chapter 14,Dane County Code of Ordinances. Other <br /> approvals may be necessary. The applicant must obtain a permit card from the Dane County <br /> Zoning counter and display it on the site prior to disturbing ground.It is recommended that you <br /> contact Zoning prior to picking up the permit card to ensure that they have received a copy of <br /> this review. <br /> HEPTA INC,Owner will notify Dane County that the plan has been implemented according to <br /> the design and specifications,as presented. Any proposed changes to the erosion control plan <br /> must be submitted in writing to the Dane County Zoning Office,with a copy given to Dane <br /> A'`� County Land Conservation Department for approval. . <br /> • <br /> 2 <br /> 938-d 91.00/L000d 9LL-1 9626-899 60 91�£2-170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.