Laserfiche WebLink
090'Woo <br /> y <br /> SE <br /> � i <br /> -'o 1 r u H s t l',ti <br /> Wisconsin Department of Transportation <br /> Transportation District 1 <br /> 2101 Wright St. <br /> Madison,WI 53704-2583 <br /> Phone:608-246-5334 <br /> Fax: 608-246-3819 <br /> scot.hinkle@dot.state.wi.us <br /> July 28,2008 <br /> LESLIE SWANSON <br /> 1022 S. PERRY PKWY. <br /> OREGON WI 53575 <br /> Subject: Doc.Of Authorized Connection#13-2681-08 <br /> Work on RNV permit#13-20-08 <br /> Swanson,Leslie <br /> Town of Rutland <br /> Dane County <br /> STH 138 <br /> Dear Leslie Swanson <br /> Enclosed is your Documentation Of Authorized Connection#13-2681-08 and Work on R/W permit 13-20-08 for access to STH 138 from <br /> your property in the Town of Rutland. It is only necessary that you sign a copy of the Work on R/W and return it to this office in the <br /> enclosed self-addressed envelope. Your work on R/W permit and documentation of authorized connection should be kept in a place that <br /> can be accessed readily if an inspector reviews your site during construction.You will also need to supply the new fire number and tax ID <br /> number for this new parcel. <br /> Please note carefully the requirements listed on the back side of the permit and conform to the construction details.Take special note that <br /> an 18"culvert and 2 endwalls are required and to shape the area to maintain good drainage. This access must be completed within thirty <br /> (30)days of the beginning of construction to minimize any disruptions in the traffic flow. Construction of this access is required to begin <br /> within one year from when this permit is issued. <br /> If you have any questions,you can contact me directly at 608 246-5334. <br /> Sincerely, <br /> Scot Hinkle <br />