|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00580
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2016 12:55:30 PM
Creation date
7/12/2016 11:18:55 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00580
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V <br /> Certificate of Compliance <br /> Provisions <br /> 1. The certificate of compliance shall show that the building or premises or part there of, and the proposed <br /> use, conform to the provisions of this ordinance. <br /> 2.Application for such certificate shall be concurrent with the application for a permit. <br /> 3. If all ordinance provisions are met, the certificate of compliance shall be issued within ten days after written <br /> notification that the permitted work is completed. <br /> 4. The applicant shall submit a certification signed by a registered professional engineer, architect or land <br /> surveyor that the fill, lowest floor and floodproofing elevations are in compliance with the permit issued. <br /> Floodproofing measures also require certification by a registered professional engineer or architect that <br /> floodproofing <br /> measures meet the requirements of s. 17.12(5). <br />
The URL can be used to link to this page
Your browser does not support the video tag.