|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00003
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 1:52:06 PM
Creation date
7/13/2016 3:22:35 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> - " ..4 Dane County Planning and Development Department <br /> Room 116,City-County Building,Madison,Wisconsin 53703 <br /> - Igt Fax (608)267-1540 <br /> Housing <br /> Economic Development <br /> (608)266-4270,Rm.362 <br /> January 7, 2009 Planning <br /> (608)266-4251,Rm.116 <br /> Mr. Timothy M. Keyes Records &Support <br /> 3854 Laudon Road (608)266-4251,Rm. 116 <br /> Cottage Grove WI 53527 <br /> Zoning <br /> RE: Addition to residence at 3854 Laudon Road (608)266-4266,Rm. 116 <br /> Parcel# 018/0711-221-9245-0 <br /> Dear Mr. Keyes: <br /> On January 2, 2009 a routine, Dane County, zoning inspection was conducted for the new homes <br /> under construction at 3837 and 3831 Laudon Road. During this inspection it was observed that a <br /> two-story addition to your residence was under construction. <br /> Section 10.25(2)(a) of the Dane County Code of Ordinances (DCCO) states that no new building <br /> shall hereafter be erected, and no existing building shall be added to, structurally altered, moved <br /> or changed in use, nor shall any nonconforming building be repaired or restored, in any district, <br /> until a zoning permit has been issued, except as otherwise provided by law or ordinance. <br /> A Dane County zoning permit is required for the addition to your residence. <br /> You are hereby instructed to obtain a Dane County zoning permit within 30 days of the date of <br /> this letter. Please find the permit materials included with this notice. <br /> If the permit is not obtained within the 30-day time period, citations will be issued for each day <br /> in violation. <br /> Your cooperation is appreciated in this matter. <br /> Sincerely, <br /> Russell L. Bartlett, bartlett@co.dane.wi.us, 608-267-3960, Zoning Inspector, County of Dane <br /> CC: Town Clerk <br /> Enclosures: Access Dane 018/0711-221-9245-0 <br /> DCi Map <br /> Copy Lot 1, Certified Survey Map#12479 <br /> Erosion control contact information <br /> Zoning permit checklist <br /> Zoning permit application <br /> Site plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.