Laserfiche WebLink
JANUARY 22, 2009 BOA PUBLIC HEARING STAFF COMMENTS <br /> 1. Appeal 3553. Appeal by State of Wisconsin Department of Transportation (Robert Kohlenberg, Project <br /> Manager, Zenith Tech, Inc., agent)for a variance from maximum allowable height of a structure permitted <br /> within the Dane County Regional Airport Height Limitation Zone as provided by Section 78.03, Dane County <br /> Code of Ordinances, to allow temporary construction cranes in four (4) locations for a bridge replacement <br /> project at the intersection of State Highway 30 (Aberg Avenue and Commercial Avenue) and US Highway <br /> 151 (East Washington Avenue), in the NE 1/4 NW 1/4 Section 05, Town 8 North, Range 10 East and the SE <br /> 1/4 SW 1/4 Section 32, Town 7 North, Range 10 East, City of Madison. <br /> OWNER: (State and Federal Highways) <br /> AGENT: Robert Kohlenberg, Project Manager, Zenith Tech, Inc. Structural Engineers and Contractors, <br /> Waukesha, WI <br /> LOCATION: City of Madison, Sections 5 T8 R1OE and 32 T7N R1OE <br /> ZONING DISTRICT: Does Not Apply <br /> COMMUNICATIONS: City of Madison — No communication <br /> Dane County Regional Airport— 12/23/2008 Email from John Robinson, Director of Operation/Public Safety, <br /> describing how the Airport would allow temporary use of cranes to help the project get started, with <br /> limitations including a requirement that "at no time will anything penetrate any higher than 953 feet AMSL" <br /> (the maximum height allowed in the AHLZ) <br /> 01/1 /2009 Einar fro Bob Kohlenberg, Zenith Tech, Inc <br /> Start date o project will be delayed from 01/19/2009 to 02/09/2009* <br /> FAA Study stilly in progress <br /> Facts of the Case: <br /> • Two existing Hwy. 30 bridges at the intersection of USH 151/East Washington Avenue and STH <br /> 30/Aberg Avenue will be replaced with one new bridge structure as part of a 2009 WDOT construction <br /> project (January through December 2009). <br /> • The bridges are located in the Dane County Regional Airport Height Limitation Zone (AHLZ) in the City <br /> of Madison. The maximum permitted height for this location on the newly adopted (10/02/2008)A.LHZ <br /> Map is 954 feet above mean sea level (AMSL). <br /> • The bridge project requires temporary construction cranes at four locations for installation of sheet <br /> piling, pile driving, and placing prestressed bridge girders at heights above the maximum AHLZ limit. <br /> One of the four locations will be used until approximately March 1, 2009 * _ <br /> pp y [ move may ba�delayed], then <br /> the crane will be moved to another of the four locations. <br /> • The agent states that existing space limitations and the absence of an adequate detour route require <br /> this project to be constructed in stages, while allowing traffic to move through the intersection. Some of <br /> the work will be completed at night. <br /> • The agent has contacted the WDOT Bureau of Aeronautics and is in the process of obtaining the <br /> required FAA approval. <br /> • ;ohn Roby son, Director of Operations/Public Safety at the Dane County Regior al Airport has ndicated <br /> tip AZA' c offs that he plans to submit;Gond Lions of the Airport but appropriate Condit Ion s�car not e <br /> determined until FAA_approval is completer <br /> • ,,The agent has received approval, with conditions, from John Robinson, Director of Operations/Public <br /> Safety at the Dane County Regional Airport, to operate cranes below the maximum height permitted in <br /> the AHLZ, with appropriate conditions, until the Board considers the variance request, but has mdreated <br /> to AZA.butte that he_does not',',plant tco do so <br /> History <br /> MA similar variance—Appeal 3.464 —was approved 03/22/2007 with Conditions as requested by Airport <br /> staff for temporary construction cranes needed during construction of the East Washington Avenue <br /> bridge over Starkweather Creek, located south of the proposed Highway 30 bridge project. <br />