|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00039
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 10:39:16 AM
Creation date
7/18/2016 12:53:04 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
iderlirr <br /> l a°p �1 <br /> 11 <br /> 104, Aveli Dane County Planning & Development <br /> Room 116, City-County Building, Madison, Wisconsin 53709 Land Division Review <br /> � Q:m <br /> `‘h,sco`'r" 608/266-9086 <br /> Property Listing <br /> 608/266-4120 <br /> Surveyor <br /> NOTICE OF FAILURE TO SUBMIT A LOCATION SURVEIg08/266-4252 <br /> Zoning <br /> 608/266-4266 <br /> Name: Richard Rilling Date:12/29/97 <br /> Address: 7409 Timber Lake Trail # 107 <br /> Madison WI 53719 <br /> Location :8 Dunn,2810 Waubesa Ave.,Par#061008217000,Lot 10 Waubesa Beach, SFR/w deck & <br /> det res. garage. <br /> When your zoning permit (ZP 1997 1556 & 1557) was issued, a condition was placed <br /> upon it requiring that a location survey be submitted to this office after the building's <br /> location was established and before work continued. <br /> If you have already had a surveyor prepare a location survey, please send a copy to <br /> our office with a copy of this letter. <br /> If you have not obtained a survey, this notice serves as a STOP WORK ORDER. <br /> You may not continue building until a survey has been received by this office. <br /> Continuation of building without having submitted a location survey constitutes a <br /> violation of the zoning permit conditions and of the Dane County Code of Ordinances, <br /> Chaper 10.25 (see below). Further enforcement actions may result. <br /> Your deadline for submitting the location survey is: January 19 1997 <br /> (30m) Location survey. As indicated in this ordinance refers to survey information prepared by a licensed surveyor <br /> indicating the location of property lines and building location distances from those property lines for the specific portions of <br /> the building indicated in this ordinance. Such surveys are not required to provide all the parcel information set forth by <br /> Wisconsin Administrative Code Chapter A-# 7.02 Minimum Standards for Property Surveys item A-E 7.01 (2) but may <br /> exclude unnecessary information as permitted in A-E 7.01 (2) and provide only the information required by the zoning <br /> ordinance but such information must comply with the accuracy standard required by A-E 7.06 Measurements. <br /> (a) Location Survey <br /> A location survey as defined herein shall be submitted to the zoning division for all construction which will be located less <br /> than 10' from required setback lines. The survey shall be done at the time when foundations or basement walls are <br /> complet . uc ey be .% 'fled to the zoning office prior to the continuation of work on the project. <br /> atric Anderson- • ng 'spector-266-9085 <br /> C.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.