Laserfiche WebLink
BEST BUDS LANDSCAPING Page 2 3/16/2009 <br /> 4. That the Building if the building is registered then any HVAC submittal(if the building is heated)or Fire <br /> Suppression or Fire Alarm systems(if otherwise required to be submitted per Comm T.61.30-3)for this project <br /> must all be registered with the Department of Commerce. Structural components(i.e.trusses)do not have to <br /> be registered separately. <br /> 5. That this registration does not affect the requirements to submit plans for plumbing systems,private sewage <br /> systems,swimming pools,elevators or other plans if applicable. <br /> 6. That upon completion of construction,this building shall be in compliance with all applicable Wisconsin codes <br /> and standards. <br /> 7. That you are responsible for retaining a Wisconsin Registered Architect or Professional Engineer,or, <br /> alternatively in the case of an HVAC system,a Registered HVAC Designer,as supervising professional <br /> throughout the construction phase of this project. The supervising professional(s)shall submit compliance <br /> statements to this agency and the municipality prior to the building being occupied. <br /> 8. That this project is subject to audit by our agency.You are responsible for maintaining a copy of the plans <br /> signed and sealed by the designer at the building site for review by our staff. Our staff has authority to enter <br /> public buildings and places of employment to determine code compliance. <br /> 9. If this construction project will disturb one or more acres of land,an Erosion Control Notice of Intent(NOI) <br /> shall be filed with the department 7 days prior to any earth disturbing activities.You will need to either file the <br /> NOI and an erosion control plan summary on-line at www.commerce.wi.gov/sb or submit a completed NOI <br /> form and either a plan summary or complete plan to us,with additional fees,or to the certified municipality. <br /> Prior to the start of construction,all applicable building permits should be obtained from the authorities having <br /> jurisdiction in accordance with local laws and ordinances. This registration satisfies the statutory requirement of s. <br /> 101.12(3)(h)for state approval prior to the granting of local permits or licenses. <br /> This registration is valid for the period indicated above. Thereafter,the unfinished portions of the project shall be <br /> redesigned to the code existing at that time and shall be re-registered with our agency. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below,or at the address <br /> on this letterhead.Please refer to the Transaction ID No.referred to in the regarding line when making an inquiry <br /> or submitting additional information. <br /> Sincerely, <br /> Fee Required$ 25.00 <br /> Fee Received$ 25.00 <br /> Balance Due $ 0.00 <br /> Karla Arenz <br /> License/Permit Prog Associate,Integrated Services <br /> (608)785-9308,Mon,Wed,Fri 10 am-3 pm WSMAU' =7648 <br /> karla.arenz@vvisconsin.gov <br /> cc: Steve Gothard,State Building Inspector,(608)235-0568,Monday <br /> Thomas W McCoy,McCoy Engineering <br /> McCoy Engineering <br />