|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00095
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 2:12:51 PM
Creation date
7/26/2016 2:27:28 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00095
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• 041 Land Conservation Division <br /> . # Dane County Land&Water Resources Department <br /> scow' Patrick"Sutter,County Conservationist <br /> DATE: March 31, 2009 <br /> TO: Chris &Jennifer Gladem <br /> Owners <br /> FROM: Jason Tuggle <br /> Erosion Control Specialist <br /> RE: Lot 82 Prairie Creek- Shoreland Erosion Control Plan, SE2009-0041 <br /> The submitted shoreland erosion control plan meets the needs of the site. The plan includes the <br /> following requirements: <br /> 1. The site will only be accessed off Brookview Court using a stone tracking pad. The pad <br /> must be a minimum of 30' long x 20' wide x 12" deep and be constructed of 3-inch clear <br /> stone. No other site access may be used and any material deposited in the road will be <br /> cleaned up at the end of each workday. <br /> 2. Silt fence must be installed prior to grading in the locations shown on the plan and where <br /> deemed necessary. The silt fence must be maintained until the site is vegetated and <br /> stabilized. <br /> 3. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as "undisturbed" or "vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 4. The plan includes a construction schedule as follows: <br /> Grading and construction is scheduled to begin upon receipt of all required <br /> permits. <br /> All disturbed areas must be restored with permanent seed and mulch by July 28, <br /> 2009. <br /> The construction site will follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (July 28,2009) and may be amended prior to permit expiration only. This review is for the <br /> shoreland erosion control requirements of Chapter 11, Dane County Code of Ordinances only and <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 1 Fen Oak Court,Room 208,Madison,Wisconsin 53718-8812-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.