Laserfiche WebLink
• Dane County Planning and Development Department <br /> Room 116,City-County Building,Madison,Wisconsin 53703 <br /> 47:47.7"— Fax (608) 267-1540 <br /> Housing& <br /> Economic Development <br /> (608)266-4270,Rm.362 <br /> June 4, 2009 <br /> (April 13,2009) Planning <br /> (608)266-4251,Rm. 116 <br /> Mr. Steven L.Page <br /> 2229 County Highway T Records &Support <br /> Sun Prairie WI 53590 (608)266-4251,Rrn. 116 <br /> Zoning <br /> (608)266-4266,Rm.116 <br /> NOTICE TO SUBMIT A LOCATION SURVEY <br /> Location: 2229 County Highway T, Lot 1, Certified Survey Map#7432, Town of Sun Prairie, Section 22 <br /> Parcel#: 058/0811-221-8701-0 <br /> Your zoning permit(#20090104)was issued with a condition requiring that a location survey be submitted to <br /> this office after the building's location was established,and before work continued. In your case, a location <br /> survey by a licensed surveyor is required to verify distance for the minimum required setback to the side lot line. <br /> Please submit this location survey by mail or hand-deliver to our office, attention to Russell L. Bartlett. It must <br /> reach me within two weeks of the date of this letter or a citation will be issued for each day of non-compliance. <br /> Continuation of work without submitting a location survey has constituted a violation of the zoning permit <br /> conditions and of the Dane County Code of Ordinances, Chapter 10.25 (see below),and may result in further <br /> enforcement actions. <br /> 10.01 (30m)Location survey, as indicated in this ordinance, refers to survey information prepared by a licensed <br /> surveyor indicating the location of property lines and building location distances from those property lines for <br /> the specific portions of the building indicated in this ordinance. Such surveys are not required to provide all the <br /> parcel information set forth by Wisconsin Administrative Code Chapter A-E 7.02 Minimum Standards for <br /> Property Surveys item A-E 7.01(2) but may exclude unnecessary information as permitted in A-E 7.01(2)and <br /> provide only the information required by the zoning ordinance but such information must comply with the <br /> accuracy standard required by A-E 7.06 Measurements. <br /> 10.25(3)(a) 1.A location survey as defined herein shall be submitted to the zoning division for all <br /> construction, which will be located less than 10'from required setback lines. The survey shall be done at the <br /> time when foundations or basement walls are completed, or when slab is poured. Such survey shall be <br /> submitted to the zoning office prior to the continuation of work on the project. <br /> Thank you for your cooperation, and I look forward to receiving the location survey. <br /> Sincerely, / <br /> Russell L. Bartlett,bartlett@co.dane.wi.us, 608-267-3960,Zoning Inspector, County of Dane J <br /> Enclosures: Copy ZP20090104 <br /> ***NOTICE TO APPLICANT*** p <br /> Return envelope Z G' <br /> fvf� / , <br /> 4 <br /> /n2,30 <br /> C6 c ‘13/1 <br /> f <br />