|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00955
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2016 12:59:32 PM
Creation date
8/2/2016 12:59:29 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00955
Town
Verona Township
Section Numbers
11
AccelaLink
DCPCUP-0000-00955
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III (Sec. 10.17 ( 4 ) con t ) <br /> 10-52 <br /> 0 ( j ) Bowling alleys shall provide ( 4 ) Topsoil from the area of <br /> five ( 5) parking spaces for each operation shall be saved and <br /> alley. stored on site for reclamation of <br /> ' the area. <br /> PI (k ) Garages and service stations <br /> shall provide adequate parkign ( 5) Reclamation of the area of <br /> space for vehicles waiting to be operations is required as <br /> III111; serviced or repaired. follows: <br /> ( 1 ) Motels shall provide one ( 1 ) (a) Final slopes shall not be <br /> parking space for each lodging graded more than 3 :1 except in a <br /> room plus one ( 1) space for each quarry operation. <br /> dwelling unit. (b) The area shall be covered <br /> with topsoil and seeded to <br /> Section 10.19 Reserved for Future prevent erosion. <br /> Use. (c) The area shall be cleared of <br /> all debris and left in a <br /> workmanlike condition subject to <br /> Section 10.191 PROCEDURE AND the approval of Dane County. <br /> TANDARDS OF/ OPERATION FOR <br /> INERAL EXTRACTION OPERATIONS. (6) Mineral extraction operations <br /> which existed prior to 1969 and <br /> ( 1) The purpose and intent of were registered with and approved <br /> iii <br /> this section is to provide a by the Dane County Zoning <br /> centralized listing of the Administrator shall be considered <br /> procedures and standards of nonconforming uses in accordance <br /> operation for mineral extraction with s. 10. 21 . <br /> 101 operations which may be permitted <br /> in several districts. <br /> ( 2) The application for the Section 10.192 PROCEDURE AND <br /> conditional use permit necessary STANDARDS OF OPERATION FOR <br /> iill to conduct a mineral extraction LIMITED FAMILY BUSINESS. ( 1 ) <br /> operation shall include a written The purpose and intent of this <br /> description of the proposed section is to provide a central- <br /> !'" <br /> operation including a time ized listing of the procedures <br /> mial schedule of development and <br /> termination, a site plan and a and standards of operation for limited family businesses which <br /> topographic reclamation plan. may be permitted in several <br /> districts. <br /> ill ( 3) Excavations below the grade ( 2) A conditional use permit for <br /> of an abutting public street or a limited family business is <br /> highway shall be set back from designed to accommodate small <br /> the street or highway a distance family businesses without the <br /> ill at least equal to the distance necessity for relocation or <br /> that is required for buildings or rezoning while at the same time <br /> } structures under s. 10.17 . <br /> (j- Cjzi-j/LIL'a'L <br /> l'!1 <br /> Ilia <br /> III Second Quarter, Supp. #9 11/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.