Laserfiche WebLink
I <br /> Conditions C U P # 955 <br /> 1 . Hauling shall be on Cross Country Road to the Landfill . ' <br /> 2 . Hauling shall be limited to one season in 1992 . <br /> 3 . There shall be a gradual feathered slope in all detention <br /> basins and ponds . No vertical walls . <br /> 4 . In regards to dust, the Town Chairperson, if after <br /> physically viewing the site, deems that dust is causing a <br /> problem, will have the <br /> control measures correcting the problem can <br /> 5. Approximately ten acres of land will be opened up for clay <br /> • extraction at one time . When the excavation is complete on <br /> the first ten acres , <br /> the next ten acres will be stripped of <br /> topsoil . That topsoil will then be placed on the first ten <br /> acres stripped. This procedure will then .be repeated for <br /> the following acres . After the topsoil is replaced, it will <br /> be graded and seeded. <br /> 6 . Soil erosion control will be required and enforced. <br /> 4 Siltation fences shall be constructed as required. <br /> , • <br /> 7 . Hours of operation shall be 6 : 30 am to 5: 30 pm. Truck <br /> hauling shall be limited to 7 : 00 am to 4:00 pm. The <br /> ,tent is that work days shall be Monday through Friday with <br /> the exception of an occasional Saturday for rain make-up. <br /> 8 . A good faith effort shall be made to leave several inches of <br /> clay on site . Surface of topsoil will be prepared prior to <br /> seeding such that roots could be established. <br /> 9 . The land shall be kept in grassland/hay production for an <br /> initial five year period to allow soil structure to become <br /> re-established, and to assure no harmful effects to area <br /> groundwater. <br /> 10 . After this initial period, the reintroduction of a more <br /> intense land use such ass row-crop <br /> eommagriculture <br /> approval ,be allowed <br /> based on soil test resul t <br /> 11 . The Town of Verona Board will be notified of any requested <br /> changes in land use . <br /> 12 . Soil testing shall include remapping based on soil borings'. <br /> In addition, test plots shall be done to determine yields on <br /> the rebuilt soil so future nitrogen can be closely tied to <br /> yield expectations . <br /> 13 . Groundwater monitoring wells may also be required. <br /> 14 . Land use must follow State Standards for nutrients and <br /> pesticides currently being set by <br /> agencies . - _ <br /> -- <br /> • � - = _ <br />