Laserfiche WebLink
• <br /> Joe Sokal - November 10, 1989 2 . <br /> The present revised space needs of the Bureau of Research are: <br /> Office 4,900 ASF <br /> Lab 6 Support 1,950 ASF <br /> Library 1,400 ASF <br /> !list Support (copy room, <br /> map room, reception, <br /> clerical, conference 1.450 ASF <br /> Total Space Required 9,700 ASF @ 75% EFF — 13,000 GSF <br /> Existing Wakanda Building 7,239 ASF @ 75% EFF — 9,600 GSF <br /> The revised space request is the result of numerous DNR meetings that <br /> considered space saving measures such as compact shelving, reduction in office <br /> space and shared laboratory facilities. It also reflects an increase of 8 <br /> staff since the original space request was compiled. The requested space does <br /> n reflect a future need of an additional 1,350 ASF that will be necessary by <br /> 1995. The Department feels that accepting a design solution that does not <br /> meet the present needs of the bureau let alone considering future needs is <br /> basically a waste of time and scarce financial resources. DNR prefers to do <br /> this project correctly at the Wakanda site or seek an alternative solution. <br /> The Department of Natural Resources is committed to quality construction. <br /> This commitment includes not only basic design, structural and mechanical <br /> elements but also a quality productive environment for its employees. It is <br /> unclear at this point how this commitment can be honored when it is suggested <br /> that 9,700 ASF of documented space needs be accommodated in 7,200 ASF of <br /> existing space at Wakanda. The situation has been thoroughly studied by a <br /> consultant. The consultant recommends that an addition is necessary; DNR <br /> concurs. <br /> DNR is now requesting that DOA reconsider its earlier decision that an <br /> addition is not necessary and allow the architect to prepare a design report <br /> that reflects the true space need in this facility. The Department feels very <br /> strongly about this issue and is willing to seek additional funding to support <br /> an increased scope of work. <br /> We would continue to work very closely with DOA on issues of esthetics and <br /> handicapped accommodations. We would appreciate any help that you can provide <br /> to expedite this problem. <br /> D`!:ds <br /> v:\8911\pm9wakan.dcm <br /> cc: &SbV IIgc410+04a4-A'/y ItEN T KA-EP/Ne.E+e - ACS/47, <br /> RE.4E.c. Pte,/y <br /> T�b N -4,,7- 01 - SA <br /> XE.W SPC, #- SD <br />