|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00473
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2016 1:11:35 PM
Creation date
8/8/2016 12:58:20 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o1 Water Resource Engineering Division <br /> fr • ,4. Dane County Land&Water Resources Department <br /> ,p s# Jeremy Balousek,P.E.Division Manager <br /> C014 <br /> INFORMATION FOR THOSE OBTAINING EROSION CONTROL <br /> & STORMWATER MANAGEMENT PERMITS <br /> Read the permit approval letter and understand the conditions under which <br /> the permit was approved. <br /> The permit will expire on the stabilization date shown on this permit card. <br /> The permit may only be revised or extended prior to the expiration date with <br /> the written approval of Dane County Water Resource Engineering. <br /> Once a permit expires it is null and void. If the site has not been stabilized by <br /> the expiration date a new permit will be required. Double fees will be charged <br /> for all remaining disturbed areas. <br /> The failure to comply with the conditions of the permit will be considered a <br /> violation of County Ordinance and may result in a stop-work order, citations <br /> and fines for each day the site is in violation. <br /> The permit is for land disturbing activities regulated under Dane County <br /> Chapters 11 or 14 only. Other municipal, county, state or federal permits may <br /> be required. <br /> As-built certification for Stormwater Management Permits must be <br /> submitted to the Water Resource Engineering Division after site <br /> stabilization. All stormwater management practices must be in place prior <br /> to permit close out and release of financial security. <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 5201 Fen Oak Drive,Room 208,Madison,Wisconsin 53718-PH:608/224-3730,FAX:608/224-3745 <br /> www.countyofdane.com/landconservation <br />
The URL can be used to link to this page
Your browser does not support the video tag.