|
Help
|
About
|
Sign Out
Home
Browse
Search
TIE 40511340000 (6)
DaneCounty-Planning
>
Tie Sheets
>
SCANNED & INDEXED
>
TIE SHEETS
>
TIE 40511340000 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 9:48:05 AM
Creation date
8/9/2016 3:10:07 PM
Metadata
Fields
Template:
Planning Records
Document_Type
Tie Sheets
Surveyor's_Name
Lord, Kevin
Corner_Number
40511340000
Date
7/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DANE COUNTY PUBLIC LAND SURVEY MONUMENT RECORD <br /> This record shall show the location of the corner and shall include all of the following nine elements (a <br /> through j). <br /> (a) CORNER LOCATION MARK CORNER LOCATION <br /> SECTION NUMBER: 34 <br /> TOWNSHIP 05 NORTH, RANGE 11 EAST <br /> 34 <br /> DANE COUNTY COORDINATES <br /> NORTHING: 399,743.10 <br /> EASTING: 878,210.74 e <br /> HORIZONTAL DATUM &ADJUSTMENT: NAD 83(NSRS 2011) DANE COUNTY <br /> ORTHOMETRIC HEIGHT: 830.50 VERTICAL DATUM: (NAVD 88) <br /> (b) Describe any record evidence, monument evidence, occupational evidence,testimonial evidence or <br /> any other material evidence you considered, and whether the monument was found or placed. <br /> A 1 1/4" Iron Pipe was found at the approximately centerline Scheldt Road at a 90-degree bend in the roadway <br /> going north and west. The previous reference monuments were not recovered. A 2" Iron Pipe was found at <br /> the location shown for the Northeast 1/4 corner of Section 3, Porter Township, Rock County. The distance <br /> between the monuments verified well. The location of the 1 1/4" Iron Pipe was accepted based on the <br /> verification between adjacent section corners and use in surveys in the area. Four reference ties were <br /> established and tied to the corner. <br /> (c) CORNER LOCATION SKETCH: In the sketch, provide reference ties to at least 4 witness monuments of <br /> lasting durable material. <br /> (d) The sketch shall include physical features surrounding the monument location sufficient to easliy find the <br /> monument when in the general area, such as but not limited to utility poles, signs, trees, edge of forests or <br /> cropland, field lanes, water bodies, pavement, buildings, etc. Sketch shall also indicate north and scale, and <br /> include descriptions of symbols, in sketch or by legend. <br /> N.'t ) ) /��`I <br /> W �IY <br /> AM E <br /> POLE RA 0 <br /> OVERHEAD--� 43.72' /-� <br /> LINES \\ N_84°48'47"E.__f----7.J <br /> OH / 1CP S <br /> / \� '�, o 10' 20' <br /> 0W,/ VII, A1�^A w ......... <br /> SV 03 AN SOUTHEAST 'y/ \ 1 I1, ;4 1 SECTION 34 \g CULVERT'- C 1g EDGE / \ - %PE .84 <br /> SCHELDT i, ��'i 4 <br /> ROAD LEGEND <br /> �/ g�/`t a\F` Fsrd° . 1 1/4"IRON PIPE-SECTION CORNER <br /> PAVEMENT EDGE / 27 50' s•82,05,54.LI''� SOUTHEAST 1/4 SECTION 34 <br /> , 27. - nnn(' 2"IRON PIPE-SECTION CORNER <br /> (rv(ZJ. \ NORTHEAST 1/4 SECTION 3,ROCK CTY. <br /> 0 SET 3/4"IRON REBAR <br /> TREELINE <br /> CORNER IDENTIFICATION NUMBER 40511340000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.