Laserfiche WebLink
' . <br /> CONDITIONS <br /> C.U.P. $806-C <br /> 1) . Permit issued pursuant to the Reclamation Plan submitted by Wolf <br /> Paving. Plan site drawing #901-L by Dave Cheney revised 2/2/90. <br /> 2) . Final grade shall not exceed 3 to 1 slope or be less than 0.5%. <br /> 3) . Six inches of black dirt shall cover all reclaimed areas. <br /> 4) . Fill material hauled into this area shall be clean uncontaminated soil <br /> only, no debris. <br /> 5) . No water that contains soil shall escape from this site. <br /> 6) . Operating hours shall be 7:00 am to 7:00 pm Monday through Saturday. <br /> 7) . A gate shall be installed near the right of way of Highway T and be <br /> locked when the pit is unattended. <br /> 8) . Plan shall be completed by June 1, 2010. <br /> I <br /> 0 <br /> I <br /> 4 <br /> • <br /> 0 <br />