|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00178
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00178
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 3:10:55 PM
Creation date
8/11/2016 3:10:49 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Certificate of Compliance <br /> Provisions <br /> 1.The certificate of compliance shall show that the building or premises or part there of, and the proposed use, <br /> conform to the provisions of this ordinance. <br /> 2.Application for such certificate shall be concurrent with the application for a permit. <br /> 3. If all ordinance provisions are met, the certificate of compliance shall be issued within ten days after written <br /> notification that the permitted work is completed. <br /> 4. The applicant shall submit a certification signed by a registered professional engineer, architect or land surveyor <br /> that the fill, lowest floor and floodproofing elevations are in compliance with the permit issued. Floodproofing <br /> measures also require certification by a registered professional engineer or architect that floodproofing <br /> measures meet the requirements of s. 17.12(5). <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.