Laserfiche WebLink
(e) Describe any material discrepancy between the location of the corner as restored or reestablished and <br /> the location of that corner as previously restored or reestablished by distance and direction. Show the <br /> discrepancy In the sketch on sheet 1. <br /> N/A <br /> (f)Was the corner restored through acceptance of(1)an obliterated evidence location,or(2)a found <br /> perpetuated location? <br /> FOUND PERPETUATED LOCATION. FOUND SURVEY NAIL AND 3 WITNESS MONUMENTS. SET 1 <br /> WITNESS MONUMENT. <br /> (g&h)Was the corner reestablished through proportionate methods? if so,show the method, Including the <br /> directions and distances to other public land survey corners used as evidence or used for proportioning In <br /> determining the corner location? <br /> NO <br /> (I) LJst all previous Monument Records found, previously filed for the subject corner, including monument <br /> types set or found,surveyor,and date of survey. <br /> JULY 25. 1979 - GLEN NORTHROP SET RAILROAD SPIKE AND FILED A TIE SHEET. <br /> UNDATED (REC.8-10-79) - D. V. DOYLE REPLACED RAILROAD SPIKE WITH AN ALUMINUM MONUMENT <br /> AND FILED A TIE SHEET. <br /> FEBRUARY 3. 1995 - HOWARD LICHT FOUND ALUMINUM MONUMENT AND FILED A TIE SHEET. <br /> JULY 17, 1997 - KUTY MEYERS SET SURVEY NAIL IN LOCATION OF ALUMINUM MONUMENT THAT <br /> WAS DESTROYED IN ROAD RESURFACING. <br /> 1, RYAN M. COMBS Affix Land Surveyor Seal <br /> hereby certify that the corner location shown on <br /> this record was determined by me or under my 0"gC O Ns viii <br /> direction and correct and that this U.S. Public ' ••.••""...••• <br /> Land Survey Monument Record is correct RYAN M. •*'� <br /> complete to the best of my knowledge and belief. = COMBS ce <br /> S.26�� ; o <br /> O JANESVILLE ii 4 .77 <br /> of CI%s ••. WI 0. Q �. <br /> i0_ /0. ........ C3 s, <br /> Pd /� �� NAL LANO�`�� <br /> /�/ 08/03/2016 risill <br /> Signature Date <br /> # 40509030020 <br />